Highland Homes Model At Light Farms

Highland Homes has the highest satisfaction rating with our clients year over year. We think you will agree after touring the model and chatting with their staff. Everyone at the Highland Model Home in Light Farms is awesome. Be sure and say hi to Ann, Teressa and Pam when you stop by or better yet, let us give you a tour and introduce you...

The 558 model consists of 5 bedroom and 4 1/2 bathrooms and is 3,295 square feet.

The kitchen in the Highland Homes model in Light Farms

The kitchen in the Highland Homes model in Light Farms

The family room in the Highland Homes model in Light Farms

The family room in the Highland Homes model in Light Farms

The dining room in the Highland Homes model in Light Farms

The master in the Highland Homes model in Light Farms

The master bath  in the Highland Homes model in Light Farms

The nursery in the Highland Homes model in Light Farms

The playroom  in the Highland Homes model in Light Farms


LIGHT FARMS HOMES FOR SALE


Come along as we build this home for our clients...

Drywall Floating | Building A Highland Home in Light Farms
We are building in Light Farms with Highland Homes on this build job. Join us every week as we walk the build job and check on the progress Highland Homes is making. Be sure and call us if you are considering building a new home.
Drywall | Building A Highland Home in Light Farms
The drywall is going in and it should take 3-4 days to complete...
Insulation | Building A Highland Home in Light Farms
The insulation is being installed and it really removes all the outside noise in the home.
Mechanical | Building A Highland Home in Light Farms
The Mechanical phase consists of: plumbing, electrical, water and all wiring run through the walls.
Framing Finishing | Building A Highland Home in Light Farms
The roof, siding, framing and windows are all finished...
Framing Delay | Building A Highland Home in Light Farms
Rain, Rain go away, now we have a framing delay...
Framing | Building A Highland Home in Light Farms
Framing has finally started on this amazing highland home in Light Farms
Foundation | Building A Highland Home in Light Farms
The foundation has been poured and the concrete or "mud" is curing as we speak.
Trenching | Building A Highland Home in Light Farms
Trenching is the process of digging all the ditches or "trenches" for the deepest part of the foundation.
Building A Highland Home in Light Farms | Foundation Inspection
We just had the foundation inspection and it passed with flying colors. We offer a pre-pour, during pour and post pour foundation inspection.
Foundation Pipes | Building A Highland Home in Light Farms
The pipes, side boards and cables are being installed in the foundation.
Foundation Digging | Building A Highland Home in Light Farms
The dirt is finally being dug for the foundation.
Foundation Trenching | Building A Highland Home in Light Farms
The process of marking and digging the dirt is under way.
Foundation Form Boards | Building A Highland Home in Light Farms
The foundation boards are put in place. They hold back the liquid cement and make sure it stays where it should.
Foundation Form Boards | Building A Highland Home in Light Farms
The boards are going up and soon the cement will flow...
Permits Still Waiting | Building A Highland Home in Light Farms
The city of Celina can take up to 8 weeks for permits to build a new home.
Foundation Prep | Building A Highland Home in Light Farms
The preparation for the foundation is under way.
Blueprints Part 2 | Building A Highland Home in Light Farms
The blueprints are still in process and waiting to be returned.
Blueprints Are Finished | Building A Highland Home in Light Farms
The blueprints are finished and should be returned to us soon.
Pre-Foundation | Building A Highland Home in Light Farms
We have begun pre-foundation work.
Waiting On Permits | Building A Highland Home in Light Farms
We are waiting on permits from the city and it could take up to 8 weeks.